中文 英文

24hour hotline

+86-15064467521

INFORMATION DETAILS

INFORMATION DETAILS

TEL

+86-15064467521

Weifang Luyang waterproof material Co., Ltd

ADDRESS:Industrial Park, Taitou Town, Shouguang City

CONTACT
One component polyurethane waterproof coating

One component polyurethane waterproof coating

产品介绍  本产品分为SBS改性沥青防水涂料、橡胶改性沥青防水涂料、道桥沥青防水涂料、是用热塑性橡胶(SBS、SIS)或丁苯橡胶(SBR)、氯丁橡胶(CR)、天然橡胶(NR)、聚乙烯(PE)、聚乙烯(

信息详情

2018010611064025960

Product introduction

This product is divided into SBS modified asphalt waterproof coating, rubber modified asphalt waterproof coating, road and bridge asphalt waterproof coating. It uses thermoplastic rubber (SBS, SIS) or styrene butadiene rubber (SBR), chloroprene rubber (CR), natural rubber (NR), polyethylene (PE), polyethylene (PP), ethylene vinyl acetate copolymer (EVA), polyvinyl chloride (PVC), APAO as modifiers, and liquid road asphalt and filler And petroleum resin.

Product features

Due to the effect of temperature and machinery, the high polymer makes asphalt enter into its three-dimensional network structure and becomes an organic polymer elastomer, which greatly improves the performance of asphalt and endows the product with the characteristics of rubber.

It is convenient for construction and has a wide range of application. It has obvious advantages for the construction of complex parts.

The maintenance is convenient, and the original waterproof effect can be achieved only by partial maintenance of the damaged parts.

After curing, a seamless and complete elastic waterproof layer is formed, which improves the waterproof and impermeability of construction engineering, which can not be achieved by coiled material products.

Performance criteria



1495075172752884

Construction precautions

The base course shall be smooth, firm and free from sand, and the depression shall be leveled with mortar.

Before use, it must be stirred evenly (precipitation in the barrel is a normal phenomenon, and it can be used after mixing).

The thickness of brushing must be controlled within 0.5mm, otherwise the solvent under the surface will volatilize slowly after the surface starts to film, and there will be hand sticking phenomenon. In this case, a layer of powder can be spread on the surface, and the next construction can be carried out after wiping.

1496989328620005

One component polyurethane waterproof coating

详情信息

2018010611064025960

Product introduction

This product is divided into SBS modified asphalt waterproof coating, rubber modified asphalt waterproof coating, road and bridge asphalt waterproof coating. It uses thermoplastic rubber (SBS, SIS) or styrene butadiene rubber (SBR), chloroprene rubber (CR), natural rubber (NR), polyethylene (PE), polyethylene (PP), ethylene vinyl acetate copolymer (EVA), polyvinyl chloride (PVC), APAO as modifiers, and liquid road asphalt and filler And petroleum resin.

Product features

Due to the effect of temperature and machinery, the high polymer makes asphalt enter into its three-dimensional network structure and becomes an organic polymer elastomer, which greatly improves the performance of asphalt and endows the product with the characteristics of rubber.

It is convenient for construction and has a wide range of application. It has obvious advantages for the construction of complex parts.

The maintenance is convenient, and the original waterproof effect can be achieved only by partial maintenance of the damaged parts.

After curing, a seamless and complete elastic waterproof layer is formed, which improves the waterproof and impermeability of construction engineering, which can not be achieved by coiled material products.

Performance criteria



1495075172752884

Construction precautions

The base course shall be smooth, firm and free from sand, and the depression shall be leveled with mortar.

Before use, it must be stirred evenly (precipitation in the barrel is a normal phenomenon, and it can be used after mixing).

The thickness of brushing must be controlled within 0.5mm, otherwise the solvent under the surface will volatilize slowly after the surface starts to film, and there will be hand sticking phenomenon. In this case, a layer of powder can be spread on the surface, and the next construction can be carried out after wiping.

1496989328620005

One component polyurethane waterproof coating 2020-12-2 本文被阅读 965 次

+86-15064467521

National free service hotline: 400-658-0378

Contact person: Manager Cui mobile phone: 17863686802

website: www.jinluyang.com

Address: Industrial Park, Taitou Town, Shouguang City


Links:

Phone

+86-15064467521

TOP